Posted 1/26/2025 08:15 (#11074033 - in reply to #11072713) Subject: RE: Basis
Decaturville TN
Those are tough basis levels. Here on soybeans I have plus .15 for elevator 45 mi away and plus .90 for crush plant 142 miles away. Lines are roughly equal. Which place would you haul to with 1,200 bu loads?