|
Southern Missouri | This what we wound up using , it’s on lower deck of drone trailer and pumps out of hot mix shuttles and has inch and a quarter line going up to top deck and use inch and quarter line going across top deck to fill/landing area of drone , fills 13.2 gal xag pro 100 tank in 45 seconds, have a long inch and quarter solid tube with inch and quarter valve on top end of pipe , also have valve on top deck can turn and same pump shoots hot mix solution back down to hot mix shuttles and keeps the mix in good suspension
(IMG_8996 (full).png)
(IMG_8997 (full).png)
(IMG_8998 (full).png)
Attachments ----------------
IMG_8996 (full).png (145KB - 75 downloads)
IMG_8997 (full).png (215KB - 78 downloads)
IMG_8998 (full).png (118KB - 76 downloads)
| |
|